Engineering Capabilities
Our major strength is the knowledge and experience of our
Engineering and Design team. Our engineering team has over 15 years experience with
developing high quality economically developed products. With this experience we can offer
multiple solutions to a customer to achieve even the most aggressive program goals. Our
engineering team works closely with our customers to provide a better understanding of
what the project goals are. We believe that communication of project goals with our
customers is vital to the success of any project.
Design/Development
Design Software: ProE V20, Solid
Works, ACAD R 14
File transfer capability: FTP-Taiwan/Texas/CA/China
3D Sheet metal Design Available
Sheet Metal:
Thin Metal:
Plastic:
Prototype:
|
SECC, CR, SUS301, 303,304,
SPTE
SUS301 0.15t, BECVR2K 0.1, BSP3 0.1
PP, ABS, HIPS, PC, PVC, PA, POM
NCT, Laser cut, Machining, SLA |
|
|
| Lead Times |
|
|
Average Material
Lead Time:
Average Manufacturing Lead Time:
Average Hard Tool Lead Time (in house):
Average Hard Tool Lead Time (Sub contracted):
Average Soft Tool Lead Time (in house):
Average Soft Tool Lead Time (Sub contracted): |
3 Weeks
1 Week
5-7 Weeks
7-9 Weeks
1 Week
2 Weeks |

| Our
Facilities Capabilities |
|
| We are continually
improving our facilities with the latest tools and innovations. Improved tooling and
quantity of tools, lowest production cost using robotic transfer, developing a raw
material cutting factory, value-added assembly (a barebone solution). These are some of
improvements for 1999. |
| Total Floor Space: |
|
FKI-
Dong Quan ---------------- 190K Sq. Ft
FKI-Taiwan ----------------------- 88,074 Sq. Ft
Hong Chi Taiwan --------------- 54,050 Sq. Ft
Hong Hsin China --------------- 72,000 Sq. Ft
Taiwan
1. Research & Development
2. Project management
3. Sheetmetal tooling
4. Plastic tool design
5. Plastic tool Fab
6. Plastic injection mold
7. Painting
8. Stamping - low volume less than 100K per month
9. Assembly - mechanical & Electro mechanical
10. PC component Fab
China
1. Research & Development
2. Project management
3. Sheetmetal tooling
4. Plastic tool design
5. Plastic tool Fab
6. Plastic injection mold
7. Painting
8. Stamping - high volume more than 400K per month
9. Assembly - mechanical & Electro mechanical
10. PC component Fab
| Sheet metal parts
capacity: |
China 400K (2 Shifts) |
| Current Capacity: |
Taiwan 100K (1.5 Shifts) |
|
|
|